Square Shower Baths /
1600mm Right Hand Square Shower Bath

WBS1685R

  • £563.00 Includes VAT
  • Height: 390MM
  • Width: 1600MM
  • Depth: 850MM
  • Guarantee: 5 Years
  • Finish: White

Specifications /

  • Manufactured from sanitary grade acrylic
  • Contemporary square design
  • Configurable left or right hand options
  • Bath panels sold separately
  • Supplied with legset

You may also like / Complete the look

Missing Thumbnail Image
WBP1685L /
1600mm Left Hand P-Shaped Bath

Missing Thumbnail Image
WBP1685R /
1600mm Right Hand P-Shaped Bath

Missing Thumbnail Image
WBS1685L /
1600mm Left Hand Square Shower Bath

Missing Thumbnail Image
NSBS2 /
L-Shaped Bath Screen

Missing Thumbnail Image
JTY004 /
Slide Rail Kit

Missing Thumbnail Image
WIN304 /
Windon Deck Mounted Bath Shower Mixer With Kit