Bath Panels /
Square Shower Bath Front Panel (1500mm)

WBS302

  • £171.00 Includes VAT
  • Width: 500 MM
  • Depth: 167 MM
  • Length: 1495 MM
  • Guarantee: 5 Years
  • Finish: White

Specifications /

  • Co-ordinating front and end panels
  • Available in both acrylic and wooden materials
  • Large range of colours to co-ordinate with furniture

You may also like / Complete the look

Missing Thumbnail Image
WBS303 /
Square Shower Bath Front Panel (1600mm)

Missing Thumbnail Image
WBS301 /
Square Shower Bath End Panel (700mm)

Missing Thumbnail Image
WBS300 /
Square Shower Bath Front Panel (1700mm)

Missing Thumbnail Image
WBS1585L /
1500mm Left Hand Square Shower Bath

Missing Thumbnail Image
NSBS2 /
L-Shaped Bath Screen

Missing Thumbnail Image
ARV304 /
Arvan Deck Mounted Bath Shower Mixer With Kit