Bath Panels /
Square Shower Bath End Panel (700mm)

WBS301

  • £140.00 Includes VAT
  • Width: 500 MM
  • Depth: 26 MM
  • Length: 697 MM
  • Guarantee: 5 Years
  • Finish: White

Specifications /

  • Co-ordinating front and end panels
  • Available in both acrylic and wooden materials
  • Large range of colours to co-ordinate with furniture

You may also like / Complete the look

Missing Thumbnail Image
WBS300 /
Square Shower Bath Front Panel (1700mm)

Missing Thumbnail Image
NMP131 /
Shower Bath End Panel (700mm)

Missing Thumbnail Image
WBS302 /
Square Shower Bath Front Panel (1500mm)

Missing Thumbnail Image
WBS1785L /
1700mm Left Hand Square Shower Bath

Missing Thumbnail Image
TSI304 /
Bath Shower Mixer

Missing Thumbnail Image
JTY386 /
Thermostatic Bar Shower With Kit