Square Shower Baths /
1700mm Left Hand Square Shower Bath

WBS1785L

  • £563.00 Includes VAT
  • Height: 390MM
  • Width: 1700MM
  • Depth: 850MM
  • Guarantee: 5 Years
  • Finish: White

Specifications /

  • Manufactured from sanitary grade acrylic
  • Contemporary square design
  • Configurable left or right hand options
  • Bath panels sold separately
  • Supplied with legset

You may also like / Complete the look

Missing Thumbnail Image
WBB1785R /
1700mm Right Hand B-Shaped Bath

Missing Thumbnail Image
WBB1785L /
1700mm Left Hand B-Shaped Bath

Missing Thumbnail Image
WBS1785R /
1700mm Right Hand Square Shower Bath

Missing Thumbnail Image
ERSBS0 /
L-Shaped Hinged Bath Screen

Missing Thumbnail Image
ARV304 /
Arvan Deck Mounted Bath Shower Mixer With Kit

Missing Thumbnail Image
A3273A /
Luxury Slide Rail Kit