Square Shower Baths /
1700mm Right Hand Square Shower Bath
WBS1785R
- £563.00 Includes VAT
- Height: 390MM
- Width: 1700MM
- Depth: 850MM
- Guarantee: 5 Years
- Finish: White
Specifications /
- Manufactured from sanitary grade acrylic
- Contemporary square design
- Configurable left or right hand options
- Bath panels sold separately
- Supplied with legset